Repo hygiene
passPhase 93 cleaned package files, broken ESLint config, generated exports, and confirmed clean status.
Owner: Engineering
Action: Keep safe targeted git add discipline for all future phases.
OmegaCrownAI Phase 94
Phase 94 packages the completed OmegaCrownAI v6.3 through v7.1 implementation arc into a production release candidate with release gates, release notes, deployment runbook, rollback checklist, and post-launch validation.
Release hash: e121c7ff4f4d137036b238176a1742f4b07dc152d6c8d046d3409b26b655e8dac24610d85ae51efdff1757031d689e2343b4d18af375d5ec73e3ef95ab04ed2c
Status
conditional_ready
Gates
9
Release notes
9
Runbook steps
7
Phase 93 cleaned package files, broken ESLint config, generated exports, and confirmed clean status.
Owner: Engineering
Action: Keep safe targeted git add discipline for all future phases.
Production build completed successfully after Phase 93 cleanup.
Owner: Engineering
Action: Run npm run build before deployment and after environment changes.
Project OS system hash present: 28d254a0fdd3256ca7726bd93b5995c5cf5b74449837e35ed70c2cb48173cd23453c619c56dd2008beecb80581e435bdb3f329fa716f216d03be3ff13dad0afd
Owner: Product
Action: Use Project OS dashboard as release command surface.
Executive plan hash present: 5ab5b076915512e19517abbb3c06d2454ef78f623ad49607c0fb761b02b2cfc18877604ed174abfc6e5842d9bef44a89e20f8494ce6402f019465d19920385ac
Owner: Executive
Action: Review executive weekly focus after launch.
Marketplace readiness: controlled_review
Owner: Marketplace / Security
Action: Keep high-risk providers under controlled review before broad availability.
Creative production readiness: needs_review
Owner: Creative
Action: Clear licensing-sensitive assets before public campaign publishing.
8 distribution publish jobs prepared.
Owner: Growth
Action: Run launch commander approval before live distribution expansion.
Reliability cost risk: normal
Owner: Operations
Action: Monitor cost, latency, replay, and RCA signals during post-launch validation.
Billing foundation is in place, but final Stripe checkout validation requires real test/live keys.
Owner: Finance / Operations
Action: Complete real-key checkout and portal validation before unrestricted paid acquisition.
Every completed subsystem should appear in release notes with routes and production impact.
Deployment requires clean repo, dependency install, production build, route smoke tests, and environment validation.
Rollback triggers and validation steps must be clear before public launch traffic expands.
Critical pages, APIs, legal routes, monitoring, and billing paths must be checked after deployment.
Billing, marketplace, creative licensing, and provider-sensitive items may remain controlled until validated.